Compliance Standards:
IS 1360 part II : 1970 As per IS:1448(Part 6) / IS:1350 (Part 2)
The system will consist of the following parts and accessories along with instruction manual.:
- Calorimeter vessel with bomb support & insulating base - 01
- Water Jacket - 01
- Combined lid for calorimeter vessel & water jacket - 01
- Stirrer - 01 set
- Connecting lead for calorimeter bomb - 01 set
- Fine adjustment valve with built in pressure gauge - 01
- Connecting tube to connect bomb, pressure gauge and fine regulating valve - 01
- Safety Relief Valve fitted on gas filling tube adapter - 01
- Pellet Press - 01
- Spanner for Oxygen tube connection - 01
- Ignition Wire - Nichrome - 01 Roll of 5 meter
- Cotton Thread - 01 Roll
- Stand for Bomb Lid - 01
- Hook for Lifting Bomb - 01
- Crucible SS - 01
- Gas Release Valve - 01
- Bomb Firing Unit - 01 Set
- Differential Type Digital Thermometer (resolution 0.01°C) complete with sensor - 01 No
- O-ring for bomb & valve - 01 set each
- Schrader Valve with Key - 01 each
- Standard Benzoic Acid - 01 Bottle
- Resolution of 0.001°C can be provided at extra cost of Rs.40,000.00
Pre-Installation Requirements for all Bomb Calorimeters to be arranged by you:
- Digital Top Pan Balance (0.0001 gm.)
- 2 KVA UPS with Batteries (30 min backup).
- RO (50 liter) approx.
- Oxygen Cylinder 99.9% Purity (47L, minimum 70 kg/cm2 pressure).
- Clean Dust Free Room, Solid vibration free working table away from windows, ovens and other heat generating source.
- Any others consumable etc.
Click here for working video : https://www.youtube.com/watch?v=CxosLXJE3vs&t=149s